/var/www/html/slims9/lib/SearchEngine/DefaultEngine.php:610 "Search Engine Debug 🔎 🪲"
Engine Type ⚙️: "SLiMS\SearchEngine\DefaultEngine"
SQL ⚙️: array:2 [ "count" => "select count(distinct b.biblio_id) from biblio as b left join mst_publisher as mp on b.publisher_id=mp.publisher_id left join mst_place as mpl on b.publish_place_id=mpl.place_id where b.opac_hide=0 and (b.biblio_id in(select ba.biblio_id from biblio_author as ba left join mst_author as ma on ba.author_id=ma.author_id where ma.author_name like ?))" "query" => "select b.biblio_id, b.title, b.image, b.isbn_issn, b.publish_year, mp.publisher_name as `publisher`, mpl.place_name as `publish_place`, b.labels, b.input_date, b.edition, b.collation, b.series_title, b.call_number from biblio as b left join mst_publisher as mp on b.publisher_id=mp.publisher_id left join mst_place as mpl on b.publish_place_id=mpl.place_id where b.opac_hide=0 and (b.biblio_id in(select ba.biblio_id from biblio_author as ba left join mst_author as ma on ba.author_id=ma.author_id where ma.author_name like ?)) order by b.last_update desc limit 10 offset 0" ]
Bind Value ⚒️: array:1 [ 0 => "%Oberlender, Garold D.%" ]
This book presents the basic principles of estimating the time and cost of con¬struction projects. To prepare an accurate estimate the estimator must perform a careful and thorough analysis of the work to be performed. The analysis includes the type and quantity of work, type and size of equipment to install the work, and jobsite conditions that are unique to the project that can impact the ti…
This book presents the basic principles of estimating the time and cost of con¬struction projects. To prepare an accurate estimate the estimator must perform a careful and thorough analysis of the work to be performed. The analysis includes the type and quantity of work, type and size of equipment to install the work, and jobsite conditions that are unique to the project that can impact the ti…
This book presents the basic principles of estimating the time and cost of con¬struction projects. To prepare an accurate estimate the estimator must perform a careful and thorough analysis of the work to be performed. The analysis includes the type and quantity of work, type and size of equipment to install the work, and jobsite conditions that are unique to the project that can impact the ti…